Developer
Hines, Ivanhoé Cambridge
Builder
EllisDon
Architect
WilkinsonEyre Architects, Adamson Associates Architects, EVOQ Architecture Inc.
Engineering
RJC Engineers, The Mitchell Partnership Inc.
EXACT Scope
- Temperature monitoring for mass concrete elements
- Maturity monitoring of the core to alert the project team when the strength of the concrete is nearing the 16MPa that is required for jacking the self climbing formwork system to the next level
- Formwork pressure monitoring to ensure that the self consolidating concrete (SCC) is not exerting loads higher than what the system was designed for
Check out this awesome timelapse that Urban Toronto just posted of the construction to date!
Read more about it on Urban Toronto.
Time lapse view of CIBC SQUARE rising, images by Forum contributor sikandar